Epe Road Phase 1


Design and construction of road network of approximately 17km, which includes dual and single carriageways, sidewalks, drainage, traffic signage and lighting.

  • Location: Epe, Lagos, Lagos State
  • Client: Lagos State Government
  • Value: $124 Million
  • Duration: 1st phase 16 months, 2nd phase 24 months

Mobility and connectivity within the Epe vicinity have significantly improved after the revamp of the phase I road networks. Craneburg was the chosen contractor for this project.

The Epe road – phase I project was the first of a 2 phase road project – to revamp the Epe road network. Craneburg was responsible for the design and construction of road network of approximately 17km of tarmac road, which includes dual and single carriageways, sidewalks, drainage, traffic signage and lighting. The Duration of the project was 16 months. Phase II of the project is currently ongoing.

Additional Scope of Work

  • Installation of 100Km uPVC pipes
  • LV, HV power cable extension
  • Installation of Powerhouse including 4 Transformers(50Kva each) and 4 generators with photocell and changeover
  • Design and construction of 17KM road network
  • Construction of 7 Dual carriageway segments
  • Construction of single carriageway segments