Epe Roads Phase II

Portfolio Categories: Civil Works, Roads and Bridges, and Water and Wastewater.

Project Details

Design and construction of road network of approximately 44km, which includes dual and single carriageways, sidewalks, drainage, traffic signage and lighting.

  • Location: Epe, Lagos, Lagos State
  • Client: Lagos State Government
  • Value: $192 Million

The Epe road – phase II project is the second of a 2 phase road project – to revamp the Epe road network. Craneburg is responsible for the design and construction of road network of approximately 44km of tarmac road, which includes dual and single carriageways, sidewalks, drainage, traffic signage and lighting. The Duration of the project is 16 months. Phase II of the project is currently ongoing.

Additional Scope of Work

  • Installation of 225Km uPVC pipes
  • Design and construction of 225 KM uPVC pipes
  • Installation of 3 transformers 300KVA each
  • Installation of LV, HV power cable extension
  • Installation of 11 generators (75 and 100KVA)